Roofing Over Cinema Hall At Fifth Floor Using Puff Sheet.
Spaceframe Buildings designed and delivered a quality facility, on time. Spaceframe determined and designed specific concrete loads to guarantee longevity of their warehouse area both internally and externally.The Pentaumec construction team continued to liaise with the client to ensure continuity with the plans and meeting client expectations, delivering their ready to occupy facility with no delays.
Watch the Full video of construction in the video below.